Gold Member Since 2017
Audited Supplier
Foshan Hongye Furniture Ltd.

Table, Coffee Table, Furniture manufacturer / supplier in China, offering Living Room Furniture New Design Coffee Table (D40), European Leisure Furniture Living Room Arm Chair (T11), Living Room Leisure Furniture Diamond Chair (NC02) and so on.

(/ )

Supplier Homepage Product Coffee Table Living Room Furniture New Design Coffee Table (D40)

Living Room Furniture New Design Coffee Table (D40)

FOB Price: US $40-49 / pieces
Min. Order: 10 pieces
Min. Order FOB Price
10 pieces US $40-49/ pieces
Get Latest Price
Port: Shenzhen, China
Production Capacity: 8000pieces/Year
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: D40
  • Material: Top 8mm Tempered Glass/Marble S/S Frame(201#,304#)
  • Customized: Non-Customized
  • Color: Red/Black/White Marble+S/S with Gold or Polished
  • Trademark: HONG YE
  • Specification: 36*45*55
  • Style: Modern
  • Folded: Unfolded
  • Condition: New
  • Usage: Living Room, Hotel, Bed Room
  • Transport Package: Standard Export Package
  • Origin: Foshan
Product Description
Model: D40  Style: Modern 
 
Material:Top 8mm tempered glass/Marble S/S Frame(201#,304#) 
 
color: Red/Black/White Marble+S/S with gold or polished
 
Condition: New
 
Usage: Living Room, Hotel, Bed Room 
 
Specification: 36*45*55
 
Origin: Foshan  Guangdong
 
Trademark: HONG YE   Transport Package: Standard Export Package
Living Room Furniture New Design Coffee Table (D40) Living Room Furniture New Design Coffee Table (D40)
Living Room Furniture New Design Coffee Table (D40)
Living Room Furniture New Design Coffee Table (D40)



 
Product NameSmall coffee table
ModelD40
Size36*45*55
ColorRed/Black/White Marble/gold or polished
MaterialTop 8mm tempered glass/Marble S/S Frame 
CBM/PCS0.07
Delivery timeTrial order lead time:10-15days.
Formal order lead time:15-20days.
Payment termL/C at sight   T/T
 
Terms of trade:
1.Payment terms:T/T or L/C at sight.
2.Terms of price: EXW, FOB
3.Delivery time:15~25 days after receiving 30% deposit or Original L/C,70% balance should be paid before the loading
4.Loading port: Shenzhen

 
Send your message to this supplier
Avatar
Mr. Ken Yao
*From:
To: Mr. Ken Yao
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category